Last Update: June 15, 2015 (HST)

Hyper Suprime-Cam Queue Mode Observation Workshop

Hyper Suprime-Cam キュー・モード観測 ワークショップ


[Registration | 参加登録]

We appreciate your registrations. Travel support request was closed on May 20, 2015 (Japan time).


Date | 日時

June 16, 2015 (Tue) 11:00 - June 17, 2015 (Wed) 14:30 (JST)
2015年6月16日(火) 11:00 〜 6月17日(水) 14:30 (日本時間)

Venue | 場所

Subaru Large Seminar Room, Subaru Bldg., NAOJ Mitaka Campus
国立天文台三鷹キャンパス すばる棟大セミナー室

Remote Connection | ビデオ会議接続

Please make a Registration if you wish a remote connection with a comment of questing remote connection.

Join from PC, Mac, iOS or Android: https://zoom.us/j/909675603
Meeting ID: 909 675 603

Some connections from Polycom/Lifesize systems (H.323) will be available. Please contact hscqwg [at] naoj.org if you wish to use H.323 connection.

Host and Sponsor | 主催

Subaru Telescope - NAOJ
国立天文台 ハワイ観測所

Banquet | 懇親会

June 16 (Tue) 18:30 -, at Subaru Building
6月16日(火) 18:30〜、すばる棟

すばる棟にて軽食を用意してハワイ観測所スタッフと懇談する時間を設けます。 参加費は1000円です。参加を希望される方は6月11日(木)までに 参加申込 で申し込んで下さい。既に参加申し込まれた方で懇親会参加を希望される方は hscqwg [at] naoj.org にメールでお知らせ下さい。

We will have a small banquet for frank discussion. starting from 6:30pm, June 16 at Subaru Building. Fee is 1,000 JPY. If you want to join, please make a registration by Thursday, June 11th.

Circulars


Purpose

New queue mode observation for Hyper Suprime-Cam (HSC) will be opened from S16A.  Queue mode observation is a new observation model for Subaru Telescope. In this workshop, HSC Queue Working group will introduce the outline, policies, and procedures of HSC queue-mode observation. Practically, participants will learn about how to prepare the observation proposal (Phase 1) and how to prepare  and submit observation  plan (Phase 2). The meeting will be conducted in English and Japanese depends on session.


Documents

Draft documents on HSC queue-mode observations. "Program PI document" is for users who wish to submit proposals for HSC queue-mode. "Operation document" aims at defining policies and procedures for HSC queue-mode. It includes some information only necessary for Subaru Telescope staff members, but it is useful to understand the entire picture of the queue-mode procedure.

Phase 2 spreadsheets. In S16A we will provide a spreadsheet templete for Phase 2 (submission of Observing Blocks). these files will be used in the hands-on session during the workshop.


Program

June 16 (Tue) 10:00 - 18:00

10:00 - 11:00 Registration
11:00 - 12:00 Introduction and important policies (Iwata)   [PDF]

[12:00 - 13:00 Lunch]

13:00 - 13:20 Q/A
13:20 - 13:40 Implementation Plan: STAGE 1 to STAGE 3 (Pyo)   [PDF] [pptx]
13:40 - 14:00 CfP to Data Delivery  (Pyo) [link (need Adobe flash)]
14:00 - 14:30 Introduction of HSC instrument and observation mode (Nakata)
                       : Filters, Overheads, Calibration   [PDF]
14:30 - 14:50 How to write proposal (Phase 1) (Pyo)   [PDF]

[10 min Break]

15:00 - 15:40 Queue-mode scheduling (Jeschke)   [PDF]
15:40 - 16:10 "qplan" and Simulations (Yeh)   [PDF]
16:10 - 16:50 Quality Assessment (IQA & FQA) (Nakata)   [PDF]
17:00 - 17:30 Data Delivery (Jeschke)   [PDF]
17:30 - 18:00  Q/A

[18:30 - 20:00 light  banquet ]
Subaru Large Seminar Room

June 17 (Wed) 09:00 - 14:30

09:00 - 10:00 Phase 2 Observing Blocks preparation (Yeh, Jeschke)   [PDF]
10:00 - 12:00 Practice of OB preparation   Q/A

[12:00 - 13:00] Lunch time

13:00 - 14:00 Discussion
14:00 - 14:30 Closing Remark


[Registration Form]

HSC Queue Working Group

Tae-Soo Pyo, Francois Finet, Masatoshi Imanishi, Takeshi Inagaki, Ikuru Iwata, Eric Jeschke, Russell Kackley, Shintaro Koshida, Fumiaki Nakata, Sherry Yeh.


Contact address: hscqwg(at)naoj.org